Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56065 REL 19: 2002-077-00 EXP FY16 ESTUARY/OCEAN SUBGROUP (EOS)
Project Number:
Title:
Estuary/Ocean Research, Monitoring and Evaluation (RM&E) Support
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia River Estuary Columbia Estuary 50.00%
Lower Columbia Columbia Lower 50.00%
Contract Number:
56065 REL 19
Contract Title:
2002-077-00 EXP FY16 ESTUARY/OCEAN SUBGROUP (EOS)
Contract Continuation:
Previous: Next:
56065 REL 15: 2002-077-00 EXP EOS RME
  • 56065 REL 23: 2002-077-00 EXP FY17 ESTUARY/OCEAN SUBGROUP (EOS)
Contract Status:
Closed
Contract Description:
The goal of this project is to facilitate and provide technical support for the estuary/ocean subgroup (EOS) and the Expert Regional Technical Group (ERTG) for estuary habitat restoration, as organized under the federal Columbia Estuary Ecosystem Restoration Program (CEERP).  The project will also investigate CEERP restoration design challenges, provide technical support for BPA’s tributary research, monitoring, and evaluation (RME) program, and analyze particular FCRPS operations to protect salmon and steelhead listed under the Endangered Species Act.  Overall, this project will aid the action agencies in estuary-related aspects of implementation of the 2008 Biological Opinion (BiOp) on operation of the Federal Columbia River Power System (FCRPS) (National Marine Fisheries Service 2008 ).

Comprehensive research, monitoring, and evaluation (RME) and estuary habitat restoration by the Action Agencies (Bonneville Power Administration [BPA] and U.S. Army Corps of Engineers [Corps]), as stipulated in the 2008 BiOp, are ongoing in earnest in the lower Columbia River and estuary (LCRE).  Specifically, the BiOp’s Reasonable and Prudent Alternative (RPA) action 37 called for the Action Agencies to convene the ERTG to use “…habitat metrics to determine the estimated change in survival…” resulting from off-site mitigation actions in the lower river and estuary.  RPA actions 58-61 deal directly with estuary RME.  The Pacific Northwest National Laboratory (PNNL) has been contracted annually by BPA to facilitate the EOS since 2002 and the ERTG since 2009.  This work also includes technical support and facilitation for the CEERP adaptive management process.

Implementation of restoration projects in the CEERP restoration program has identified design challenges regarding the effectiveness of certain restoration techniques.  These challenges can adversely affect timelines of individual restoration project engineering designs, and result in inadequate information for cost-benefit analysis.  Moreover, there is a need for program-scale information developed from multiple sources and ecosystems in the Pacific Northwest and disseminated to support restoration planners.  These types of restoration design challenges have not typically been monitored as part of the CEERP action effectiveness monitoring and research.  Therefore, focused investigations of specific design challenges is warranted.

BPA’s overall RME effort supports implementation of the Fish and Wildlife Program and relevant elements of the FCRPS BiOp.  Specifically, BPA is undertaking an effort to develop a strategic blueprint for Tributary Research, Monitoring, and Evaluation (TRME). Fulfillment of this particular strategy will benefit from technical review and support during its development and dissemination.  
The current FCRPS BiOp period ends in 2018.  Therefore, analysis and technical support of particular FCRPS operations (to be determined) will be relevant to BPA.
Account Type(s):
Expense
Contract Start Date:
09/01/2016
Contract End Date:
10/31/2017
Current Contract Value:
$432,324
Expenditures:
$432,324

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
All administrative tasks fulfilled with timely quality products B: 119. Project Administration 10/31/2017 10/31/2017
FY16 Contract Annual Report C: 132. Annual Report to BPA for time period covering October 2016 to September 2017 10/31/2017 10/31/2017
Watershed Coordination/EOS/CEERP D: 191. 191a Watershed Coordination/EOS/CEERP 10/31/2017 10/31/2017
Watershed Coordination/ERTG E: 191. 191b Watershed Coordination/ERTG 10/31/2017 10/31/2017
191c Tributary RME Support F: 191. 191c Tributary RME Support 10/31/2017 10/31/2017
Restoration Design Challenges Report G: 141. *(Amend#1; CCR-38075) Other Reports for BPA 10/31/2017 10/31/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 09/01/2016
B 119 Project Administration 09/01/2016
C 132 Annual Report to BPA for time period covering October 2016 to September 2017 09/01/2016
D 191 191a Watershed Coordination/EOS/CEERP 09/01/2016
E 191 191b Watershed Coordination/ERTG 09/01/2016
F 191 191c Tributary RME Support 09/01/2016
G 141 *(Amend#1; CCR-38075) Other Reports for BPA 09/01/2016